User Tools

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
campaigns:session_four [2023/01/16 00:11] – adding events cheismanncampaigns:session_four [2023/02/12 13:49] (current) – fix heading cheismann
Line 1: Line 1:
-======Session Three======+======Session Four======
  
 ==26 Oct 2523== ==26 Oct 2523==
Line 43: Line 43:
 The ship leaves the DIB dock and returns to its rented berth on the ring. Shortly after arriving, E1L-33N contacts Scruffy, and says she can arrange some contracts for runs to Dorax, which is on the Delta Thread. This prompts the crew to have the Needle Drive tuned to Delta. ED1-50N starts up on the tuning, and estimates it will take five weeks.  The ship leaves the DIB dock and returns to its rented berth on the ring. Shortly after arriving, E1L-33N contacts Scruffy, and says she can arrange some contracts for runs to Dorax, which is on the Delta Thread. This prompts the crew to have the Needle Drive tuned to Delta. ED1-50N starts up on the tuning, and estimates it will take five weeks. 
  
-The crew reaches out to [[npcs:Stoyan Deliivanov]] from [[setting:Quilling Engineering]] to transport his team and equipment to [[setting:Centerra Station]]. He agrees to pay them 35KCr for a 3G burn to the station.  They also reach out to [[npcs:James Cineus]] and agree to help him extract someone from the station. He pays 20KCr up front, and promises another 40KCr upon completion of the job. They also agree to run 18 dTons worth of relief supplies for the [[setting:Red Crescent]] at the standard in system rate of 500Cr/ton, for 9KCr. +The crew reaches out to [[npcs:Stoyan Deliivanov]] from [[setting:Quilling Engineering]] to transport his team and equipment to [[setting:Centerra Station]]. He agrees to pay them 35KCr for a 3G burn to the station.  They also reach out to [[npcs:James Cineus]] and agree to help him extract someone from the station. He pays 20KCr up front, and promises another 40KCr upon completion of the job. They also agree to run 18 dTons worth of relief supplies for the [[setting:Heart of Cethalara]] at the standard in system rate of 500Cr/ton, for 9KCr. 
  
 ==29 Oct 2523== ==29 Oct 2523==
Line 52: Line 52:
  
 ==31 Oct 2523== ==31 Oct 2523==
-Arrive at Centerra Station at approx 0600 GMT.  Quilling Engineering off loads their equipment, as does the Red Crescent.  James Cineus gathers the crew at his container, opening it to reveal a plethora of weapons and other equipment, and invites those who will be traveling with him to arm themselves. +Arrive at Centerra Station at approx 0600 GMT.  Quilling Engineering off loads their equipment, as does the [[setting:Heart of Cethalara]].  James Cineus gathers the crew at his container, opening it to reveal a plethora of weapons and other equipment, and invites those who will be traveling with him to arm themselves. 
  
 **End Session**  **End Session** 

This website uses cookies. By using the website, you agree with storing cookies on your computer. Also, you acknowledge that you have read and understand our Privacy Policy. If you do not agree, please leave the website.

More information